am Intelligence
0%FOUNDATION

Foundation

Power-Ready AI Infrastructure
Built for Large-Scale Deployment

Two decades delivering utility-scale power, cooling and deployment at record timelines engineered into AI data centers customers can trust.

20+years of delivery
~5 GWenergy architecture
Tier 3+design configuration
64 MWmodular shells
Scroll to explore

Power delivery

Grid-Scale Power, Ready on Day One

Direct grid interconnection plus on-site generation deliver dependable, high-density power to every shell from first energization to full-scale AI operation.

Grid interconnectionOn-site generation Dispatchable supplyFirst-energization ready

Modular by design

Prefabricated AI Shells, Built for Speed

Standardized 64 MW shells are factory built and assembled on site. Repeatable infrastructure that expands seamlessly with demand.

64 MW modulesFactory-built Expedited time-to-powerLower deployment cost

Density & cooling

Cooler, Denser, Faster AI

Built for high-density AI workloads, our data centers use advanced liquid cooling systems to efficiently manage rack heat loads exceeding 220 kW.

5–15 kWstandard rack
220+ kWAI rack heat load
Direct-to-chipliquid cooling

Redundancy

Designed for Continuous Uptime

~5 GW Energy architectureReady access to pumped-storage and renewable projects supports high-density, power-intensive AI workloads.
Tier 3+ Uptime by designOn-demand power plus grid supply keeps data centers at continuous uptime, even at peak load.
Fault-tolerant redundancyRedundant power, cooling and backup pathways prevent any single failure from disrupting workloads.

Sustainability

Low-Carbon From Day One

Renewable power made dispatchablePumped storage converts intermittent wind and solar into reliable, on-demand power for continuous AI operations.
2+ GW on-demand zero-carbon powerDispatchable clean power for large-scale AI infrastructure, schedulable via the EnergyOS platform.
25-year price certaintyNon-escalating power pricing supports predictable, long-term AI infrastructure economics.